DEVELOPMENT & POWER LINES
Power lines, whether overhead or underground, often cause issues when development sites are planned.
​
The voltage and whether they are overhead or underground, will normally dictate whether the DNO (electricity company) are prepared to look at relocation or not.
​
With National Grid, due to the expense of their equipment, it is normally very unlikely that a relocation option will be available. In these cases careful assessment of the loss of development will need to be calculated.
​
BLB Utilities are currently involved with several large schemes of this magnitude and ideally placed to assist small and large developers to realise appropriate levels of compensation.
​
With lower voltage lines we can assist with possible electrical network alterations to ensure developments can take place as designed.
​
As always, the earlier we become involved with any scheme helps in either managing movement of equipment, where possible, or assessment of a compensation package.
​
If you are planning a new development and need help managing existing power lines, please contact us to find out how we can help.