DEVELOPMENT & POWER LINES

Power lines, whether overhead or underground, often cause issues when development sites are planned.

​

The voltage and whether they are overhead or underground, will normally dictate whether the DNO (electricity company) are prepared to look at relocation or not.

​

With National Grid, due to the expense of their equipment, it is normally very unlikely that a relocation option will be available. In these cases careful assessment of the loss of development will need to be calculated.

​

BLB Utilities are currently involved with several large schemes of this magnitude and ideally placed to assist small and large developers to realise appropriate levels of compensation.

​

With lower voltage lines we can assist with possible electrical network alterations to ensure developments can take place as designed.

​

As always, the earlier we become involved with any scheme helps in either managing movement of equipment, where possible, or assessment of a compensation package.

​

If you are planning a new development and need help managing existing power lines, please contact us to find out how we can help. 